Projects
Home » Projects

Supervision: Faris & Faris

Contractor: Medrar Contractor 

Supervision: Faris & Faris

Contractor: Medrar Contractor 

Supervision: Faris & Faris

Contractor: Medrar Contractor 

Supervision: Faris & Faris

Contractor: Habash-Deir Contracting 

KIM-HS was added to swimming pool foundation and walls.

KIM-HS was added to watertanks foundation and walls.

KIM-HS admixture reduces water permability and increases the durability of structure.  

KIM-HS was added to 2000 m3 of foundation concrete.& watetanks concrete. 

KIM-HS admixture reduces water permability and increases the durability of structure.

KIM-HS was added to swimming pool foundation and walls.

KIM-HS admixture reduces water permability and increases the durability of structure.  

KIM-HS was added to swimming pool foundation and walls.

KIM-HS admixture reduces water permability and increases the durability of structure.  

KIM-HS was added to the slab on grades concrete at Arab Potash Plant.

KIM-HS reduces water permeability & minimizes the speed of steel corrosion.     

Pages

  • Project Title: Abdoun Center Project
  • Location: Amman, Jordan
  • Contractor: Maktabna Investment
  • Year Of Application: September,2021
  • Strengthened Elements: Columns #21 in multiple layers
  • The Purpose Of The Strengthening Was To Increase The
    Columns Capacity To Add Extra 2 Floors To The new Building
© 2020 Developed by Blue Ray for Web Solutions. All rights reserved